Sökning ()
Ebenen einblenden
Skidområden
Längdåkning
Boenden
Sommar
Vandringsturer
Alpintouren
Wintertouren
Turer med mountainbike
Lauftouren
Badsjöar

BERGFEX: Skidområde Leogang - Saalbach Hinterglemm Fieberbrunn - Skidsemester Leogang - Saalbach Hinterglemm Fieberbrunn - Wintersportgebiet Leogang - Saalbach Hinterglemm Fieberbrunn

Skidområden Salzburg

Skidområde Leogang - Saalbach Hinterglemm Fieberbrunn

800 - 1.914m
Kort

Leogang - Saalbach Hinterglemm...


800 - 1.914m

Pistplan Skidområde Leogang - Saalbach Hinterglemm Fieberbrunn
Snövärden Igår, 10:34
Igår, 10:34
Datum
320 cm
Berg
150 cm
Dal
64 från 70
Öppna liftar

Liftar Leogang - Saalbach...

19
22
29
0
0

Öppettider Vinter

Säsong
30.11.2018 - 22.04.2019
Betrieb
08:00 - 16:30

Pister Leogang - Saalbach...

lätt
140 km
medel
112 km
svår
18 km
Freeride/ Rutter
i.u.
totalt
270 km

Nyheter Leogang - Saalbach Hinterglemm Fieberbrunn

MULDENBAHN 8ER
A modern 8 person chairlift with heating, bubbles and automatic bars will replace the old Asitzmuldenbahn 6 person chairlift.

Start of construction: May 2018
Completion: November 2018

Capacity: More than 3500 persons per hour

Interview with Kornel Grundner – CEO of the Leogang Lift Company:

The old 6 person chairlift was built in 2003 and lacked the required capacity. In 2018 it will be replaced by a modern 8 person chairlift which can bring 3500 people every hour from the Asitzmulde to the top of the kleine Asitz. Due to this investment accessing the Leogang area will be as convenient as never before, as queues belong to the past. The NEW chairlift is a modern D-Line model with bubble, heating and automatic bars and is the first 8 person Doppelmayr D-Line chairlift in the world.

Especially the automatic bar offers a huge relief for families and children as it increases safety. Additionally the bottom station got repositioned 55 metres and a better area for entering the new Muldenbahn 8er and the Sportbahn Asitzkogel 6er was created. Which also means safer crossing and skiing towards the bottom stations.

10 EUB KOHLMAISBAHN
A modern 10-person gondola replaces the old Kohlmaisgipfelbahn.

Start of construction: Spring 2017
Completion: December 2018

Capacity: More than 3200 persons per hour

Interview with DI Walter Steiner – Operations Director of the Saalbach Lift Company and Site Manager of the Kohlmais Lift:

At the end of the winter season 2017/18, the fiery red coloured Kohlmais gondolas will be dismantled. Skiers will be able to admire the completed construction works, as the middle station was already built in the summer of 2017. The stages of the construction in progress:

The original gondolas that were erected in the year 1989 will give way in the summer of 2018, to a state-of-the-art 10-person monocable gondola lift. The new lift is identical to that of the Schönleiten lift – thus offering the ultimate comfort, efficiency and speed. Due to the fact, the new middle station of the Kohlmais lift is situated approximately 30 metres more to the west, enable initial construction works to begin in 2017. The new three-storey middle station is only missing the roof structure.

The final construction phase will be carried out during summer 2018 – what does that mean for our summer guests?
Following the demolition, assembly work will commence in May, and the Schönleiten lift will be operating in summer as a substitute for the Kohlmais lift. Incorporated in the new Kohlmais bottom station will be 100 underground parking spaces and apartments for personnel. The new building will be located at street level – enabling guests to access the ticket office easily from the Skiliftstraße. Due to extensive construction works, the Montelino’s Adventure Path will only be partially open this summer. The Milka Line will remain open and can be accessed via the trail leading from the Schönleiten. Further details regarding route modifications and roadblocks can be found on www.saalbach.com when construction works commence. We kindly ask our summer guests for their understanding! The opening of the new lift is scheduled for December 2018 and guests can look forward a faster ascent up the Kohlmais Mountain from the centre of Saalbach.

RESERVOIRS
RESERVOIR HOCHALM II
Start of construction: May 2018
Completion: October 2019

Capacity: 251.300 m³

RESERVOIR STREUBÖDEN
Start of construction: May 2018
Completion: October 2018

Capacity: 155.000 m³


Skidområde Leogang - Saalbach Hinterglemm Fieberbrunn

From Fieberbrunn to Hinterglemm, from the sunny family platter lift to the Nitro Snowpark and the black World Cup slopes, the Skicircus Saalbach Hinterglemm Leogang Fieberbrunn stretches far and wide while offering a range of contrasts. It’s the most laid-back ski region in Austria! On 270 kilometres of wonderfully groomed slopes, all skiers will be able to find their favourite slope or enjoy the various circuits at the Skicircus. If you are looking to take a break from skiing and snowboarding, visit the ski huts for culinary delights and a relaxed atmosphere.

More Details on: www.saalbach.com/en

Kontakt Skidområde Leogang - Saalbach Hinterglemm Fieberbrunn

Skidområde Leogang - Saalbach Hinterglemm Fieberbrunn

Leoganger Bergbahnen
Hütten 39, A-5771 Leogang

Telefon
+43 (0)6583 8219 0
Snötelefon
+43 (0)6583 8219 22
FAX
+43 (0)6583 8219 33
Homepage
http://www.leoganger-bergbahnen.at/
Förfrågningar
Linbanor Turistförbund
Utvärdering 4,5
Meine Bewertung:
Sportanbieter Leogang - Saalbach...
Letzte Bewertungen

Keine Einträge gefunden.

Es wurden %count% Einträge gefunden. Bitte Suche verfeinern.

Lokale Suchergebnisse (Entfernung <= 25km)

Weitere Suchergebnisse (Entfernung > 25km)

Alle %count% Suchergebnisse

%Name% %Region%
%Typ% %Hoehe%